-
0снимки
-
0гласове
-
0влияние
-
0любими
-
0следвания
За мен
- Липсва информация
За контакти
- Имейл адрес: alexl@abv.bg
- Skype: alexia_home
Оборудване
Фотоапарати:
- CANON Canon Digital IXUS
- NIKON Nikon D40x
Обективи:
- NIKKOR AF-S DX VR Zoom-Nikkor 18-200mm f/3.5-5.6G ED
Потребителя няма добавени албуми.
Коментари оставени към Автора
Заглавие | Коментар | Автор |
---|---|---|
Thai sunset / | ||
Харесва ми!
|
||
Thai sunset / | ||
Харесва ми !
|
||
Thai sunset / | ||
Brava :)
|
||
Thai sunset / | ||
(9) Vlad_bg:
|
||
Faroe Islands in the summer / | ||
Приятен кадър!
|
||
Faroe Islands in the summer / | ||
Харесвам!
|
||
Thai sunset / | ||
Харесва ми!
|
||
Thai sunset / | ||
Харесвам!
|
||
Faroe Islands in the summer / | ||
Харесва ми това! Б)
|
||
Thai sunset / | ||
(1) Daniela78:
|
Последователи:
0 души следват Александра
Потребителя няма последователи.
Коментари оставени от Автора
The system was originally scheduled to open on 24 June 2006. However, due to the incident on 17 June 2006, (see the Incident section for details), Skyrail-ITM postponed the opening day to fix the technical problems. After two months of improvement works and repair for the damages made by Typhoon Prapiroon in August 2006, Ngong Ping 360 resumed a trial-run of 7 days from 30 August 2006. It was opened on 18 September 2006. However, there have already been several reports of technical problems, some of them caused by strong winds
добре, че нямаше силен вятър, когато се качвах с него :Д
Ngong Ping Cable Car is a 5.7 km long bi-cable gondola lift system (referred to by its operators as a "cable car") linking between Tung Chung (where it connects the MTR Tung Chung station) and Ngong Ping (where the Po Lin Monastery and Tian Tan Buddha are located). Between the two terminals at Tung Chung and Ngong Ping, the lift system runs across the southern shore of the Hong Kong International Airport island and Nei Lak Shan, with eight towers including the stations.
The system was originally scheduled to open on 24 June 2006. However, due to the incident on 17 June 2006, (see the Incident section for details), Skyrail-ITM postponed the opening day to fix the technical problems. After two months of improvement works and repair for the damages made by Typhoon Prapiroon in August 2006, Ngong Ping 360 resumed a trial-run of 7 days from 30 August 2006. It was opened on 18 September 2006. However, there have already been several reports of technical problems, some of them caused by strong winds
Дали да я пусна в "Искам Критика" се чудя :)